by Darren
11. August 2010 16:10
I'm a creature of habit.
That really shouldn't come as a surprise to any of you that know me.
I haven't hit an easy rhythm here like I had in Sarnia. I'm not even sure what I can do about it. I suspect it will just take time.
It'll be nice to have air conditioning – that'll make sleeping easier. It'll be nice to have a couple of the major projects out of the way.
My office is in the Safari Room right now since our Master Suite isn't available. Our Master Suite can't be created until the Pole Barn project is done. The Pole Barn project is waiting on Plumbing, In Floor Heating and Concrete (and then a bunch of labour on interior walls).
After that's done we can waterproof, insulate, and fix the siding on to the room that's going to be the Master Suite – then we can fix the electrical and drywall the Master Suite.
So, I may have my routine back by 2012. That's not so bad.
I'm planning on putting a Home Theatre system into the Master Suite – that should be a lot of fun… I've already picked out the projector and I have my eye on a couple of screens.
I'd really like to have the Master Suite ready before we do our Grand Opening, but the Soft Launch can happen before hand.
If my plans work out for the Master Suite, I know that it's Bound to Please! (I can't wait!)